Shenyang Metro Line 3: steel for two elevated stations, supplied to China State Construction

Shaped steel for two elevated stations on Shenyang Metro Line 3: 14,500 m² and 881 tonnes, supplied to China State Construction (CSCEC) under a 2023 supply contract.

14,500 m² · 881 t · 61 kg/m² · supplied to CSCEC

Project
Shenyang Metro Line 3, elevated stations
Location
Yuhong District, Shenyang, Liaoning, China
Year
2023
Building use
Two elevated metro stations
Structure
Shaped steel frames spanning the tracks
Area
14,500 m²
Steel
881 t
Steel per m²
61 kg/m²
Supplied to
China State Construction (CSCEC)
Contract
2023 supply contract, number withheld
Aerial view of an elevated Shenyang Metro Line 3 station during steel erection
One of the elevated stations from the air, during erection

What the project involved

Shenyang Metro Line 3 stations

Each station is covered by a run of shaped steel frames that span the tracks and platforms, tied together by purlins.

Station steel like this goes up while track and platform work carries on around it. The photos show the frames standing over laid track, with purlins being fixed from boom lifts.

Why it matters to a buyer

For buyers comparing quotes

Before a tier-1 contractor buys from a fabricator, its engineers audit the plant: qualifications, equipment, welding, material traceability, coating and delivery.

This contract is one of four signed contracts with China’s tier-1 contractors that we show. The others are with Baosteel Steel Structure, China Railway Construction and China Railway Group.

Company facts: contracts and certificates →